A Retained policies

A Retained policies

Whilst the policies within the Local Plan (Part One) will replace some of those contained in the currently adopted development plan for the borough, some extant policies will be retained until such time as they are replaced by policies within the Local Plan (Part Two) Land Allocations and Details Policies Plan.  The following schedules set out those policies which the Council will retain.

Where policies are identified for deletion, a reason for the deletion and details of any changes to the adopted policies map are included within the schedules.

Chester District Local Plan

Chester District Local Plan
Policy Number Policy Title Outcome Replaced by:
 
Chapter: General Policies Guiding All Development
GE1 General Delete ‘STRAT 1 Sustainable development’
GE2 Accessibility Delete ‘ENV 6 High quality design and sustainable construction’
GE3 Impact on residential amenity Delete ‘SOC 5 Health and well-being’
GE4 Availability of utility services Delete ‘ENV 1 Flood risk and water management’
GE5 Protection of water resources Delete
GE6 Development and Flood Risk Delete
GE7 Local distinctiveness Delete ‘ENV 6 High quality design and sustainable construction’
Chapter: Environment
ENV1 General Delete ‘STRAT 1 Sustainable development’
ENV2  Local setting and context Delete ‘ENV 6 High quality design and sustainable construction’
ENV3 Public spaces and squares Delete ‘SOC 6 Open space, sport and recreation’
ENV4 Facades of development Delete ‘ENV 6 High quality design and sustainable construction’
ENV5 Accessibility/permeability Retain  
ENV6 Accessibility/permeability Retain  
ENV7 Accessibility/permeability Delete ‘ENV 5 Historic environment’
ENV8 Views, viewpoints and landmarks Retain  
ENV9 Materials Delete ‘ENV 6 High quality design and sustainable construction’
ENV10 Parking Retain  
ENV11 Safety and Security Delete

‘ENV 6 High quality design and sustainable construction’

‘STRAT 1 Sustainable development’

ENV12 Inner ring road corridor Retain  
ENV13 City Corridors Retain  
ENV14 District lighting strategy Retain  
ENV15 Strategic open space Retain  
ENV16 Development adjacent to strategic open spaces Retain  
ENV17 Other greenspace Retain  
ENV18 Amenity open space Delete ‘SOC 6 Open space, sport and recreation’
ENV19 Urban Corridors Retain  
ENV20 Greenspace improvements Delete

‘SOC 6 Open space, sport and recreation’

‘ENV 3 Green infrastructure’

ENV21 Trees, hedgerows and woodland Retain  
ENV22 Landscape and development Retain  
ENV23 Provision and maintenance of open space in new development Retain  
ENV24 Rural (general) Delete

‘STRAT 8 Rural area’

‘ENV 2 Landscape’

ENV25 Areas of Special County Value Retain  
ENV26 Green Network in Chester District Retain  
ENV27 Nature conservation strategy Retain  
ENV28 General Retain  
ENV29 Features of local importance Retain  
ENV30 Strategic wildlife corridors Retain  
ENV31 Sites of national importance Retain  
ENV32 Evaluation of archaeological sites Retain  
ENV33 Sites of regional or county importance Retain  
ENV34 District and Local importance  Retain  
ENV35 Demolition in Conservation Areas Retain  
ENV36 Recording Retain  
ENV37 New development in conservation areas Retain  
ENV38 Views Retain  
ENV39 City Centre Conservation Area Retain  
ENV40 City Centre Conservation Area Retain  
ENV41 City Centre Conservation Area Retain  
ENV42 City Centre Conservation Area Retain  
ENV43 City Centre Conservation Area Retain  
ENV44 River and Canal Corridors Retain  
ENV45 Protection of Listed Buildings Retain  
ENV46 Changes of use Retain  
ENV47 Local list of buildings of architectural or historic interest Retain  
ENV48 Historic Parks and Gardens and Historic Battlefields Retain  
ENV49 Design and location of advets Retain  
ENV50 Means of illumination Retain  
ENV51 Row signage Retain  
ENV52 Advance signs Retain  
ENV53 Shop front design Retain  
ENV54 Blinds, canopies and awnings Retain  
ENV55 Security shutters Retain  
ENV56 Generation of renewable energy Delete ‘ENV 7 Alternative energy supplies’
ENV57 Energy efficient building design and site layout Delete

‘ENV 6 High quality design and sustainable construction’

‘ENV 7 Alternative energy supplies’

ENV58 Energy efficient building design and site layout Delete

‘STRAT 1 Sustainable development’

‘ENV 7 Alternative energy supplies’

ENV59 Pollution in the plan area Delete

‘STRAT 1 Sustainable development’

‘ENV 1 Flood risk and water management’

ENV60 New or extended hazardous installations Retain  
ENV61 Development in the vicinity of hazardous installations Retain  
ENV62 After uses Delete ‘ENV 9 Minerals supply and safeguarding’
ENV63 Green Belt Delete ‘STRAT 9 Green Belt and countryside’
ENV64 Agriculture and Forestry Delete

‘STRAT 9 Green Belt and countryside’

National Planning Policy Framework

ENV65 Recreation and other open land uses Delete  
ENV66 Limited extensions, alterations or replacement dwellings Retain  
ENV67 Low Cost' housing in settlements in the Green Belt Delete

‘STRAT 9 Green Belt and countryside’

‘SOC 2 Rural exception sites’

ENV68 Countess of Chester Health Park Retain  
ENV69 Countess of Chester Health Park Retain  
ENV70 Chester zoo Retain  
ENV71 Dale Camp Retain  
ENV72 BNFL/URENCO Retain  
ENV73 BNFL/URENCO Retain  
ENV74 Huntington water treatment works and EP waste water treatment works Retain  
ENV75 Siting of telecommunications development Retain  
ENV76 Satellite dishes and antennas Retain  
ENV77 Satellite dishes and antennas Retain  
Chapter: Transport
TR1 General Delete ‘STRAT 1 Sustainable development’
TR2 Pedestrians Delete ‘STRAT 10 Transport and accessibility’
TR3 Pedestrians Delete ‘STRAT 10 Transport and accessibility’
TR4 Pedestrians Retain  
TR5 Cycling Retain  
TR6 Cycling Retain  
TR7 Major transport improvements Retain  
TR8 Public Transport - Buses Delete Out of date
TR9 Public Transport - Buses Delete

‘STRAT 3 Chester’

‘STRAT 10 Transport and accessibility’

TR10 Coaches Retain  
TR11 Public Transport - Rail Retain  
TR12 Public Transport - Rail Retain  
TR13 Parking Retain  
TR14 Parking Retain  
TR15 Parking Retain  
TR16 Residents parking schemes Delete Not required
TR17 Safety and Environment Retain  
TR18 Highway improvements Delete Completed
TR19 New developments Delete

‘STRAT 1 Sustainable development’

‘STRAT 10 Transport and accessibility’

TR20 New developments Retain  
TR21 New developments Retain  
TR22 Motorway/Roadside facilities Retain  
TR23 Car free housing Delete ‘STRAT 1 Sustainable development’
Chapter: Economy
EC1 Scale of provision of employment Delete Out of date
EC2 Allocations for Employment Land Retain  
EC3 Areas allocated for a range of employment uses Retain  
EC4 Chester Business Park Retain  
EC5 Protection of sites allocated for employment Delete ‘ECON 1 Economic growth, employment and enterprise’
EC6 Protection of existing employment land and buildings Retain  
EC7 Stanlow complex Retain  
EC8 Ince Power Stations Retain  
EC9 Unallocated employment development Delete ‘ECON 1 Economic growth, employment and enterprise’
EC10 Extensions to existing business premises Delete Covered in all other policies
EC11 Re-use of rural buildings Retain  
EC12 Home working, including teleworking Delete National Planning Policy Framework
EC13 Downgrade or unneighbourly uses Delete Not required
EC14 Tourism Retain  
EC15 Tourist accommodation Delete ‘ECON 1 Economic growth, employment and enterprise’
EC16 Tourist accommodation Delete
EC17 Beeston sand quarry Retain  
EC18 Camping and caravaning sites Retain  
EC19 Conference facilities Delete ‘ECON 2 Town centres’
EC20 Agricultural land Delete ‘STRAT 1 Sustainable development’
EC21 Agricultural diversification Retain  
EC22 New agricultural buildings Retain  
EC23 Agricultural workers dwellings in the Open Countryside and Green Belt Retain  
EC24 Agricultural service industries Delete Covered in all other policies
Chapter: Retail
RET1 The City Centre Delete ‘STRAT 3 Chester’
RET2 Primary Shopping Streets Retain  
RET3 Secondary Shopping Streets Retain  
RET4 The Market Delete ‘ECON 2 Town centres’
RET5 Allocations for retail development Delete
RET6 Protection of sites allocated for retail Delete Not required
RET7 Assessment of proposals for retail development in the City Centre Retain  
RET8 Assessment of proposals in the area immediately adjacent to the city centre Retain  
RET9 Assessment of proposals outside the city centre Retain  
RET10 Suburban shopping centres Retain  
RET11 Suburban shopping centres Retain  
RET12 Village shops Retain  
RET13 Village shops Delete National Planning Policy Framework and all other policies
RET14 Shopping development in the OC Retain  
RET15 Control over future use of large out of centre shops Retain  
Chapter: Housing
HO1 Scale of housing provision Already deleted
HO2 Allocations for housing development  Part Retain  
HO3 Affordable housing Delete ‘SOC 1 Delivering affordable housing’
HO4 Infill housing development Retain  
HO5 Criteria for assessing proposals for residential sites not allocated Retain  
HO6 Infill development in washed over villages in the GB Retain  
HO7 Housing in the open countryside Retain  
HO8 Extensions to existing dwellings Retain  
HO9 Conversion of non-residential properties to residential use Retain  
HO10 Re-use of rural buildings Retain  
HO11 Replacement dwellings Retain  
HO12 Low cost housing in the rural area Delete

‘SOC 1 Delivering affordable housing’

‘SOC 2 Rural exception sites’

HO13 Protection of existing dwellings Delete National Planning Policy Framework
HO14 Protection of land allocated for housing development Retain  
HO15 Residential accommodation for homeless persons in the community... Retain  
HO16 HMO's Retain  
HO17 Student Accommodation Retain  
HO18 Granny flats Retain  
HO19 Day nurseries Retain  
HO20 Improvement of older housing Delete Out of date
HO21 Gypsy Caravan Sites Delete ‘SOC 4 Gypsy and Traveller and Travelling Showpersons accommodation’
HO22 Non-residential uses in predominantly residential areas Delete ‘ENV 6 High quality design and sustainable construction’
Chapter: Community Facilities
CF1 Schools Delete Built
CF2 University of Chester Retain  
CF3 Re-use of surplus land and buildings Retain  
Chapter: Sport and Recreation
SR1 Assessment of public open space in urban area Retain  
SR2 Assessment of public open space in urban area Delete ‘SOC 6 Open space, sport and recreation’
SR3 Meeting the shortfall in provision Retain  
SR4 Meeting the shortfall in provision Delete ‘SOC 6 Open space, sport and recreation’
SR5 Guidelines for provision in new housing developments Retain  
SR6 Playing pitches Retain  
SR7 Amenity open space Retain  
SR8 Indoor sports provision Retain  
SR9 Golf Retain  
SR10 Athletics Tracks Retain  
SR11 Water recreation Retain  
SR12 Water recreation Retain  
SR13 Noisy Environmentally intrusive recreation Retain  
SR14 Countryside recreation Retain  
SR15 Countryside recreation Delete ‘ECON 3 Visitor economy’
SR16 Carden Park Retain  
SR17 Footpaths, bridleways and cycleways Retain  
Chapter: Culture and Leisure
CU1 Cultural buildings Retain  
CU2 Cultural buildings Delete ‘ECON 2 Town centres’
CU3 Cultural areas and historic sites Retain  
CU4 Street Events Retain  
Chapter: Urban Renaissance
URBREN1 Urban Renaissance Retain  
URBREN2 Urban Renaissance Retain  
Chapter: Monitoring and Implementation
MI1 Provision of services and infrastructure Delete ‘STRAT 11 Infrastructure’
MI2 Sealand Road Retain  

Ellesmere Port and Neston Borough Local Plan

Ellesmere Port and Neston Borough Local Plan
Policy Number Policy Title Outcome Replaced by:
 
Chapter: General Policies
GEN1 General development criteria Delete ‘STRAT 1 Sustainable development’
GEN2 Allocation of sites Delete Out of date
GEN3 Safeguarded land Delete Out of date
GEN4 Noise Delete ‘ENV 6 High quality design and sustainable construction’
GEN5 Crime prevention Delete ‘STRAT 1 Sustainable development’
GEN6 Access for everyone Delete ‘SOC 6 Open space, sport and recreation’
GEN7 Telecommunications development Retain  
GEN8 Telecommunications development Retain  
GEN9 Art Delete Out of date
GEN10 Power stations Retain  
GEN11 Renewable energy Delete ‘ENV 7 Alternative energy supplies’
GEN12 Overhead power lines Delete Out of date
GEN13 Development on agricultural land Delete ‘STRAT 1 Sustainable development’
Chapter: Housing
H1 Allocation of land for housing development Part Retain  
H2 Affordable housing Delete ‘SOC 1 Delivering affordable housing’
H3 Housing needs Delete ‘STRAT 2 Strategic development’
H4 Housing in urban areas Delete ‘SOC 6 Open space, sport and recreation’
H5 Conversion to flats Retain  
H6 House extensions Retain  
H7 Transport and access provision Delete ‘STRAT 10 Transport and accessibility’
H8 School site Already deleted
Chapter: Employment
EMP1 Sites for employment development Part Retain  
EMP2 Stanlow special policy area Retain  
EMP3 Hooton Park strategic site Retain  
EMP4 Ince Marshes Retain  
EMP5A Cheshire Oaks Delete Developed
EMP5B Cheshire Oaks Delete Developed
EMP5C Cheshire Oaks Retain  
EMP6 Established industrial areas Delete National Planning Policy Framework
EMP7 Ince Power Station site Retain  
EMP8 Land at Station Road Retain  
Chapter: Green Belt
GB1 Green Belt area Delete ‘STRAT 9 Green Belt and countryside’
GB2 Green Belt policy Delete National Planning Policy Framework
GB3 Re-use of buildings Delete National Planning Policy Framework
GB4 Housing development in the Green Belt Delete National Planning Policy Framework
GB5 Extensions and alterations to dwellings in GB Retain  
GB6 Willaston village inset Retain  
GB7 Roften area major development site Retain  
GB8 Stables and field shelters Delete National Planning Policy Framework
GB9 Large stables and riding facilities Delete National Planning Policy Framework
GB10 Golf courses Delete Out of date
Chapter: Natural and Built Environment
ENV1 Nature conservation sites (international) Delete ‘ENV 4 Biodiversity and geodiversity’
ENV2 National sites of nature conservation Delete ‘ENV 4 Biodiversity and geodiversity’
ENV3 Nature conservation sites (regional and local) Delete ‘ENV 4 Biodiversity and geodiversity’
ENV4 SNCVs Retain  
ENV5 Ecological interest Retain  
ENV6 ASCVs Retain  
ENV7 Agricultural buildings Retain  
ENV8 Urban green network Retain  
ENV9 Landscape and habitat features Retain  
ENV10 The Mersey Forest Retain  
ENV11 M53/Shropshire Union Canal Corridor Retain  
ENV12 Coastal zones Retain  
ENV13 Development in conservation areas Retain  
ENV14 Parkgate conservation area Retain  
ENV15 Conservation  of listed buildings Retain  
ENV16 Non listed buildings and structures Retain  
ENV17 Sites of special archaeological interest Retain  
Chapter: Hazard and Pollution
HAZ1 New of extended hazardous installations Delete National Planning Policy Framework/HSE
HAZ2 Development in vicinity of hazadous installations Delete National Planning Policy Framework/HSE
HAZ3 Potentially pulluting development  Retain  
HAZ4 Contaminated land Delete ‘STRAT 1 Sustainable development’
Chapter: Recreation and Tourism
REC1 Sports fields, play areas and parks Delete ‘SOC 6 Open space, sport and recreation’
REC2 Open space provision Retain  
REC3 Indoor sports and social facilities Delete ‘SOC 6 Open space, sport and recreation’
REC4 Amenity open space in residential areas Delete ‘SOC 6 Open space, sport and recreation’
REC5 Allotments Delete ‘SOC 6 Open space, sport and recreation’
REC6 Site for potentially noisy outdoor sports Delete Developed
REC7 Recreational routeways Retain  
REC8 Tourist accommodation Delete National Planning Policy Framework
REC9 Historic canal port Retain  
Chapter: Town Centre and Shopping
SHOP1 Primary shopping areas Retain  
SHOP2 Local shopping centres Retain  
SHOP3 Small shopping centres Retain  
SHOP4 Retail development Delete ‘ECON 2 Town centres’
SHOP5 Food and drink establishments Delete National Planning Policy Framework
SHOP6 Shop fronts Retain  
SHOP7 Cromwell Road Retain  
Chapter: Transport
TRANS1 Access to developments Delete ‘STRAT 10 Transport and accessibility’
TRANS2 Highway network Delete ‘STRAT 10 Transport and accessibility’
TRANS3 Freight Transport Delete ‘STRAT 10 Transport and accessibility’
TRANS4 Provision for cyclists Delete ‘STRAT 10 Transport and accessibility’
TRANS5 Car parking in residential areas Retain  
TRANS6 Car parking standards Retain  

Vale Royal Borough Local Plan

Vale Royal Borough Local Plan
Policy Number Policy Title Outcome Replaced by:
 
Chapter: General Strategy
GS1 Selection of Sites          Already deleted
GS2 New Development in the Borough Delete ‘STRAT 2 Strategic development’
GS3 North Cheshire Green Belt Delete ‘STRAT 9 Green Belt and countryside’
GS4 Changes to the North Cheshire Green Belt Delete ‘STRAT 9 Green Belt and countryside’
GS5 The Open Countryside  Retain  
GS6 Change of Use/Conversion of Rural Buildings  Retain  
GS7 Areas Affected by Former Underground Rock Salt Mining in Northwich Retain  
GS8 Proposals for New Development for Main Town Centre Uses  Delete Completed
GS9 General Urban Design Principles for Development in Northwich Town Centre Retain  
GS9A Barons Quay Development Area Retain  
GS9B Weaver Shopping Centre Extension Development Area Retain  
GS9C Land North of Leicester Street Retain  
GS9D Northwich Market Retain  
GS9E Marina Development Area Delete Completed
GS9F County Council Offices Site Retain  
GS9G Magistrates' Court Site Delete Closed
GS9H British Waterways Site Retain  
GS9I Lock Street Site Part Retain See Plan
GS9J Memorial Hall Site Delete Developed
GS9K Land West of Old Warrington Road Retain  
GS9L Land West of Queen Street Retain  
GS9M Land Adjacent to Victoria Bridge Delete Part developed
GS9N Northwich Vision Transportation Schemes Part Retain See Plan
GS9P Developer Contributions to Transport and Public Realm Improvements Retain  
GS10 Winsford Gateway Retain  
GS11 Weaver Valley Regional Park Project Delete Out of date
Chapter: Natural Environment
NE1 Protection of the Nature Conservation Resource Retain  
NE2 Designated Sites of International and National Nature Conservation Importance Retain  
NE3 Designated Sites of Local and Regional Nature Conservation and Geological importance Delete ‘ENV 4 Biodiversity and geodiversity’
NE4 Threatened and Priority Habitats Delete ‘ENV 4 Biodiversity and geodiversity’
NE5 Endangered Species Delete ‘ENV 4 Biodiversity and geodiversity’
NE6 Wildlife Corridors and Green Wedges Retain  
NE7 Protection and Enhancement of Landscape Features Retain  
NE8 Provision and Enhancement of Landscape in New Development  Retain  
NE9 Trees and Woodland Retain  
NE10 Proposals for the Establishment of Areas of Multipurpose Woodland on Derelict and Under Used Land  Retain  
NE11 Areas of Special County Value Retain  
NE12 Areas of Significant Local Environmental Value Retain  
NE13 River Corridors Retain  
NE14 Dane Valley  Retain  
NE15 Protection of the Floodplain Delete ‘ENV 1 Flood risk and water management’
NE16 Surface Water Run Off Delete ‘ENV 1 Flood risk and water management’
NE17 Watercourses Delete ‘ENV 1 Flood risk and water management’
NE18 Mersey Estuary Zone Retain  
Chapter: Built Environment
BE1 Safeguarding and Improving the Quality of the Environment   Retain  
BE2 Sewerage Infrastructure Delete ‘ENV 1 Flood risk and water management’
BE3 Water Supply Delete ‘ENV 1 Flood risk and water management’
BE4 Planning Obligations   Retain  
BE5 Historic Environment - Listed Buildings Retain  
BE6 Alteration/Extensions to Listed Buildings Retain  
BE7 Changes of Use to Listed Buildings Retain  
BE8 Listed Buildings and Archaeology Retain  
BE9 Demolition Control of Listed Buildings Retain  
BE10 Historic Environment - Conservation Areas Retain  
BE11 Development of Sites Outside the Conservation Area  Retain  
BE12 Northwich Conservation Area Retain  
BE13 Ancient Monuments/Archaeological Sites Retain  
BE14 Other Sites of Archaeological Importance Retain  
BE15 Historic Parks and Gardens Retain  
BE16 Advertisements and Signs  Retain  
BE17 Advance Directional Advertisements Retain  
BE18 Telecommunications Development Retain  
BE19 Domestic Radio, Masts, Aerials and Satellite Dishes Retain  
BE20 Jodrell Bank    Retain  
BE21 Renewable Energy Part Retain  
BE22 Locally Important Buildings Retain  
BE23 Conservation Area Appraisals Retain  
Chapter: Housing
H1 The Supply of Housing Land Already Deleted Out of date
H2 Housing Allocations Retain  
H3 Phasing Delete Out of date
H4 Housing Development Hierarchy Delete Out of date
H5 Windfall Sites Delete Out of date
H6 Change of Use/Conversion Delete Out of date
H7 Sub-Division of Existing Dwellings into Self-Contained Residential Units Delete Out of date
H8 Extensions/Alterations to Dwellings Retain  
H9 Extensions to Dwellings that have been Created Through the Conversion of a Rural Building Retain  
H10 Rebuilding/Replacement of Dwellings Retain  
H11 Extensions to Residential Curtilages in the Open Countryside and the Green Belt Retain  
H12 Density Delete  
H13 Mixed Communities Delete ‘STRAT 1 Sustainable development’
H14 Sites for Affordable Housing on Residential Developments  Delete ‘SOC 1 Delivering affordable housing’
H15 Sites for Affordable Housing within the Settlement Policy Boundaries of Frodsham, Helsby and Tier 1 Locations Delete
H16 Sites for Affordable Housing in the Green Belt/Open Countryside Delete

‘SOC 1 Delivering affordable housing’

‘SOC 2 Rural exception sites’

H17 Gypsy and Traveller Sites Delete ‘SOC 4 Gypsy and Traveller and Travelling Showpersons accommodation’
H18 Transit Gypsy Sites  Delete ‘SOC 4 Gypsy and Traveller and Travelling Showpersons accommodation’
H19 Show Person's Sites Delete ‘SOC 4 Gypsy and Traveller and Travelling Showpersons accommodation’
Chapter: Employment
E1 General Requirements for Employment Use Part Retain Delete paragraph iv
E2 Existing Non-Conforming Uses Delete Out of date
E3 Redevelopment of Employment Land for Employment Purposes Retain  
E4 Redevelopment of Existing and Proposed Employment Land for Non-Employment Purposes  Retain  
E5 Employment Land Allocations  Part Retain  
E6 Lostock Triangle, Lostock Gralam Retain  
E7 Northwich and Winsford Town Delete National Planning Policy Framework
E8 Villages Delete National Planning Policy Framework
E9 Employment Uses in the Open Countryside Outside the Green Belt Delete National Planning Policy Framework
E10 Employment Uses in the Green Belt Including Washed Over Green Belt Villages Retain  
Chapter: Recreation and Tourism
RT1 General Requirements for Recreation/Tourism Developments Delete All other policies in the Plan
RT2 Sports Facilities and Open Spaces - Allocations Retain  
RT3 Recreation and Open Space in New Developments – Space standards Retain  
RT4 Existing Formal and Informal Open Spaces and Recreational Facilities  Delete National Planning Policy Framework
RT5 Allotments Delete ‘SOC 6 Open space, sport and recreation’
RT6 Village Facilities Retain  
RT7 Tourist Accommodation within the Towns of Northwich and Winsford and the Villages Retain  
RT8 Tourist Accommodation within the Open Countryside and the Green Belt Retain  
RT9 Chalet Type Development  Retain  
RT10 The Use of Farmhouses for B&B Accommodation within the GB and OC Delete National Planning Policy Framework
RT11 Extensions to Existing Facilities Retain  
RT12 Small Extensions to Existing Hotels, Guest Houses and Other Tourist Accommodation within the Green Belt and Open Countryside  Delete National Planning Policy Framework
RT13 Touring Recreational Caravan and Camping Sites Retain  
RT14 Static Recreational Caravan Sites  Retain  
RT15 Golf Courses Retain  
RT16 Driving Ranges Retain  
RT17 Noisy Sports Part Retain Delete paragraph iv
RT18 Motor Sports Part Retain Delete paragraph i
RT19 Tourist/Recreation Related Facilities - Allocations Retain  
RT20 Mooring Facilities Retain  
RT21 The Weaver and Dane Valleys Part Retain Delete first sentence
RT22 The Winsford Flashes – Site specific policy Retain  
RT23 The Whitegate Way – Site specific policy Retain  
RT24 Delamere Forest – Site specific policy Retain  
RT25 Oulton Park Motor Racing Venue – Site specific policy Retain  
Chapter: Transportation
T1 General Requirements Delete ‘STRAT 10 Transport and accessibility’
T2 Transportation Assessments Delete ‘STRAT 10 Transport and accessibility’
T3 Public Transport Retain  
T4 Railways Retain  
T5 Railway Stations  Retain  
T6 Northwich - Middlewich - Sandbach Rail Line – safeguarded route Retain  
T7 Safeguarded Rail Lines – safeguarded route Retain  
T8 Pedestrians and Walking Delete ‘STRAT 10 Transport and accessibility’
T9 Cycling Delete ‘STRAT 10 Transport and accessibility’
T10 National Cycle Network  Delete Out of date
T11 Freight Delete National Planning Policy Framework
T12 Development of Land Adjacent to the River Weaver for Water Based Freight Facilities Retain  
T13 Car Parking Retain  
T14 Car Parking in Town and Village Centres Retain  
T15 Provision of Access for People with Disabilities Retain  
T16 Roadside Facilities Retain  
T17 Lorry Parks Retain  
T18 General Highways Policies – Safeguarded route Retain  
T19 Appropriate Traffic Calming Measures Delete Not used
T20 Travel Plans Retain  
Chapter: Shopping and Town Centre Development
STC1 General Policy Retain  
STC2 Northwich Town Centre – Allocations Retain  
STC3 Winsford Town Centre Retain  
STC4 Use of Upper Floors Retain  
STC5 Design Delete ‘ENV 6 High quality design and sustainable construction’
STC6 Design-Installation of Shutters Retain  
STC7 Proposals for Key Town Centre Development in Edge-of-Centre and Out-of-Centre Locations Delete National Planning Policy Framework
STC8 Defined Town and Large Village Centres Delete Out of date
STC9 Defined Town and Large Village Centres  Delete Out of date
STC10 Loss of Existing Ground and Upper Floor Residential Uses Delete Out of date
STC11 Large Proposals in Large Village Centres Delete National Planning Policy Framework
STC12 Local Centres in Winsford and Northwich Retain  
STC13 All Smaller Villages With or Without Defined Policy Boundaries Delete National Planning Policy Framework
STC14 All Smaller Villages With or Without Defined Policy Boundaries  Retain  
STC15 Changes of Use That Would Result in the Loss of a Public House or Other Service Serving a Rural Community Retain  
STC16 Farm Shops  Retain  
Chapter: Public Services
PS1 Public Services Development in the Open Countryside Delete Out of date
PS2 Redundant Institutions in the Open Countryside/Green Belt Delete Completed
PS3 Child Care facilities Delete National Planning Policy Framework
Chapter: Pollution, Hazards and Contaminated Land
P1 Air Pollution Delete ‘SOC 5 Health and well-being’
P2 New Development which is Sensitive to Air Pollution Delete ‘SOC 5 Health and well-being’
P3 Noise Pollution Delete ‘SOC 5 Health and well-being’
P4 Light Pollution Delete ‘SOC 5 Health and well-being’
P5 Groundwater Delete ‘ENV 1 Flood risk and water management’
P6 Hazardous Installations Delete HSE
P7 Development of a Non-Hazardous Nature in the Vicinity of Non-Hazardous Installations Delete HSE
P8 Contaminated and Derelict Land Delete ‘STRAT 1 Sustainable development’
P9 Aerodrome Safeguarding - Liverpool John Lennon Airport – Site specific  Retain  
Chapter: Rural Enterprises
RE1 Agricultural Land Delete ‘STRAT 1 Sustainable development’
RE2 Where Development is Allowed Which Involves the Loss of Agricultural Land Delete Out of date
RE3 New Agricultural Buildings Retain  
RE4 Proposals for New Buildings and Other Structures Associated with Livestock Delete ‘ENV 6 High quality design and sustainable construction’
RE5 Change of Use of Agricultural and Other Rural Buildings Delete National Planning Policy Framework
RE6 Withdrawal of Agricultural Permitted Development Rights Following a Change of Use Delete National Planning Policy Framework
RE7 Agricultural workers' Dwellings Retain  
RE8 Removal of an Agricultural or Forestry Occupancy Condition Retain  
RE9 Equestrian Development Retain  
RE10 Kennels and Catteries Retain  
RE11 Private Airstrips Delete Out of date
RE12 Farm Diversification Retain  
Chapter: After Use of Mineral Workings
MW1 General Considerations Delete ‘ENV 9 Minerals supply and safeguarding’
MW2 Consultation on County Matters Delete ‘ENV 9 Minerals supply and safeguarding’
MW3 After Uses – Site specific  Retain  
MW4 Ancillary Development Delete ‘ENV 9 Minerals supply and safeguarding’

Cheshire Replacement Minerals Local Plan

It is proposed that all policies, apart from those indicated in the table below, are deleted and replaced by Policy ‘ENV 9 Minerals supply and safeguarding’.

Policy Number Policy Title Outcome
1 Sustainability Delete
2 Need Delete
3 Aggregate reserves Delete
4 Alternative sources of aggregate Delete
5 Safeguarding high quality material Delete
6 Prior extraction Delete
7 Mineral conservation areas Delete
8 Review Delete
9 Planning applications Retain
10 Geological content of planning applications Delete
11 Pre-application discussions Delete
12 Conditions Retain
13 Planning obligations/legal agreements Retain
14 ASCV Delete
15 Landscape Retain
16 Plant and buildings Retain
17 Visual amenity Retain
18 Jodrell Bank zone Delete
19 Archaeology Delete
20 Archaeology Delete
21 Archaeology Delete
22 Nature conservation Delete
23 Nature conservation Delete
24 Built heritage and historic environment Delete
25 Ground water/surface water/flood protection Delete
26 Noise Delete
27 Noise Delete
28 Dust Retain
29 Agricultural land Delete
30 Agricultural land - silica sand Delete
31 Cumulative impact Delete
32 Advance planting Delete
33 Public rights of way Delete
34 Highways Delete
35 Alternative forms of transport Delete
36 Secondary operations Delete
37 Hours of operation Retain
38 Blasting Delete
39 Stability and support Delete
40 Mine waste disposal Delete
41 Restoration Delete
42 Aftercare Delete
43 Liaison committees Retain
44 Opencast coal Delete
45 Sand and gravel landbank Delete
46 Future sand and gravel extraction Delete
47 Sand and gravel area of search Retain
48 Hydrocarbons Delete
49 Peat Delete
50 Natural brine pumping Delete
51 Future rock salt extraction Retain
52 Future controlled brine extraction Retain
53 Crushed rock landbank Delete
54 Future silica sand extraction Delete

Cheshire Replacement Waste Local Plan

It is proposed that all policies within the Cheshire Replacement Waste Local Plan, apart from those indicated in the table below, are deleted and replaced by Policy ‘ENV 8 Managing waste’.

Policy Number Policy Title Outcome
1 Sustainable waste management Delete
2 Need for waste management facilities Delete
3 Phasing of sites for landfill/landraise and/or thermal treatment Delete
4 Preferred sites for waste management facilities Delete
5 Other sites for waste management facilities Delete
6 Built waste management facilities of a national/regional scale Delete
7 Sites for open air windrow composting facilities Delete
8 Wastewater treatment works Delete
9 Preferred sites for non-hazardous landfill/landraise Delete
10 Minimising waste during construction and development Delete
11a and 11b Development and waste recycling Delete
12 Impact of development proposals Retain
13 ASCV Delete
14 Landscape Delete
15 Green Belt Delete
16 Historic environment Delete
17 Natural environment Delete
18 Water resource protection and flood risk Delete
19 Agricultural land quality Delete
20 Public rights of way Delete
21 Jodrell Bank Delete
22 Aircraft safety Retain
23 Noise Delete
24 Air pollution: air emissions including dust Delete
25 Litter Delete
26 Air pollution: odour Delete
27 Sustainable transport of waste and waste derived materials Delete
28 Highways Delete
29 Hours of operation Delete
30 Hours of operation for HWRC Delete
31 Ancillary development at a landfill/landraise site and/or open windrow
composting site
Delete
32 Reclamation Delete
33 Liaison committees Retain
34 Energy recovery Delete
35 Underground hazardous waste storage/containment Retain
36 Design Delete