6 Chester

6 Chester

National policy

6.1 Plans should promote sustainable patterns of development including making effective use of land in urban areas and set out a positive strategy for the conservation and enjoyment of the historic environment.  Green Belt policy (including grey belt) maintains a key purpose of Green Belt is to preserve the setting and special character of historic towns.

Evidence base

Key issues

  • Chester is the borough’s largest settlement in terms of population (and dwellings) and is the main centre for offices, employment , culture, retail, leisure, higher education and tourism with a rail station serving London, Manchester, Merseyside and North Wales.
  • Chester is internationally renowned as a historic city and need to protect this including historic core and setting of the city including strategic open space.
  • This is the only area in Cheshire West and Chester where Green Belt release was considered justified due to role of the sub-regional role of the City, high levels of in-commuting, affordable housing need and delivering a mix of housing (family homes).
  • Slow delivery of Chester Business Quarter as prestige office allocation close to the rail station.
  • Supporting new offices spaces in the city centre
  • Identifying and retaining employment land allocations and sites due to pressure for residential development. 
  • The city centre has faced challenges not only from the national decline of shopping functions on the high street but from out of centre locations but is still a relatively attractive centre especially for leisure and culture.
  • Through the last Local Plan, Green Belt was assessed and only land at Wrexham Road was released as a strategic site with no other areas released due to harm to Green Belt purposes including the setting of the city. 
  • How to plan for and deliver infrastructure for the Gateway area including a new footway/cycle bridge over the railway. 
  • Dale Barracks closure for military purposes will potentially enable redevelopment for other uses. 
  • Parking policy and requirements in the city centre and surrounding area may be holding back residential schemes 
  • Supporting new residential development whilst ensuring other uses are not displaced or conflict with existing leisure uses.
  • The Chester Transport Strategy identified a potential package of measures including a 5th park and ride site (Hoole) and investigating a relief road for the west of the city.
  • Less pressure for student accommodation including purpose built than during previous Local Plan.

Map 6.1 Chester settlement area and key constraints (View full image)

Map of Chester settlements highlighting flood risk, conservation areas, open spaces, local wildlife, and SSSI sites.

Current adopted policy

Local Plan

Policy reference

Policy summary

Local Plan (Part One)

STRAT 3 Chester

Identifies Chester as a key economic driver, CBQ allocation, protection of CBP, CWEP. National and international importance of historic city and setting. 

Local Plan (Part One)

ECON
1 Economic growth, employment and enterprise

Key economic sites in Chester are identified as; Chester Business Quarter, and Chester Business Park.

Local Plan (Part Two)

CH 1 Chester settlement area

Sets criteria for development proposals in Chester, including protecting the historic core and setting, historic routes and grain in city centre etc and identifying areas of strategic open space.

Local Plan (Part Two)

CH 2 Chester regeneration areas

Identifies the key regeneration areas in Chester , including: Northern Gateway area, Castle and Riverside (including hydroelectric power at the weir), Northgate area all within context of walking/cycling, mixed use and protecting viability and vitality.

Local Plan (Part Two)

CH 3 Employment land provision in Chester

Identifies the employment land allocations in Chester to meet the strategic requirement for new employment development.

Local Plan (Part Two)

CH 4 University of Chester

Provides criteria for the development of education related facilities at the University of Chester campus sites in Chester.

Local Plan (Part Two)

CH 5 Chester conservation areas

Sets criteria for development proposals within Chester's conservation areas includes quality of design and consideration of townscape and setting of the city.

Local Plan (Part Two)

CH 6 Chester key views, landmarks and gateways and historic skyline

Identifies the key views, landmarks, gateways and historic skyline, and criteria that for development proposals in Chester.

Local Plan (Part Two)

GBC 1 - Commercial sites in the Green Belt

Identifies large-scale existing commercial and employment sites located in the Green Belt:

  • GBC 1.A Chester Zoo
  • GBC 1. B Countess of Chester Health Park
  • GBC 1.C Dale Barracks
  • GBC 1. D Chester Business Park

Local Plan (Part Two)

T 1 Local road network improvement schemes

Identifies Chester Western Relief Road as a priority local road network schemes.

Local Plan (Part Two)

T 2 A56 Hoole Road Corridor

Identifies land for a new park and ride site at the M53/A56 junction, sets out criteria for development of a new park and ride site, and supports proposals that will improve the operation of the A56 Hoole Road corridor.

Local Plan (Part Two)

T 3 Railway stations

Supports proposals for the enhancement and provision of capacity improvements of Chester Station.

Local Plan (Part Two)

T 5 Parking and access

Sets criteria for safe access to new development sites for all users and the provision and protection of sufficient parking to service the needs of development, with regard to the Council’s latest adopted parking standards.

Local Plan (Part Two)

DM 50 Archaeology

Sets the criteria for development proposals affecting archaeological heritage assets, taking into account the significance of the heritage asset and their setting, and the scale of any loss or harm.

Suggested policy approach

6.2 The level of development will depend on spatial strategy option chosen (see section SS 5 ‘Spatial strategy options’) but will seek to maximise housing and other development on previously developed land. Chester is the area with one of best levels and opportunities for public transport use, walking and wheeling therefore the new Local Plan plan will seek to increase housing especially in the city centre area. The approach will prioritise the protection of the historic environment as core to protecting the character of the city that makes it a special and highly valued place. 

6.3 The suggested approach is to combine Local Plan (Part One) policy STRAT 3 with Local Plan (Part Two) policy CH 1 as the overarching and locally distinct policy for Chester but update as needed especially to reflect allocations that have been completed and/or require a new approach.  

6.4 Local Plan (Part Two) policy CH 2 for the Chester regeneration areas will be updated to reflect the new Chester City Gateway Strategy but it is proposed to continue to include policies for Commonhall Street, Chester Castle/ Riverside (including hydro power generation) and Northgate for the remaining phases of the development.  

6.5 Chester City Gateway seeks to regenerate and improve the area around Chester rail station, including improved accessibility including new or upgraded bridges especially connecting Hoole to promote walking, wheeling and cycling. The strategy aims to deliver over 600 new homes with a mix of well-designed new houses, particularly for younger people, whilst creating sustainable healthy communities with access to facilities and green space. The strategy also seeks to build on the role of improved transport, place and housing offer to support economic growth. 

6.6 The Local Plan (Part Two) employment allocations policy CH 3 will be updated or site-specific policies developed to reflect allocations. It is proposed to retain Local Plan (Part Two) policy CH 4 for the University of Chester but can be updated if necessary. 

6.7 It is proposed to retain Local Plan (Part Two) policy CH 5 for Chester’s Conservation Area and Local Plan (Part Two) policy CH 6 for Chester's key views, landmarks and gateways, and historic skyline as these are locally distinct policies that seek to protect the special character of Chester. Local Plan (Part Two) policy CH 5 will be amended to reference the Chester Rows Design Guide which was completed in 2022. Local Plan (Part Two) policy DM 50 seeks to protect archaeological heritage assets and requires the Chester Archaeological plan to be consulted, which defines areas of archaeological significance and primary and secondary archaeological character zones. This aspect of Local Plan (Part Two) policy DM 50 will be incorporated into the Chester policy section to ensure the special archaeological assets of Chester continue to be protected.

6.8 Several large-scale major sites in the Green Belt are located close to the settlement boundary edge of Chester – Chester Zoo, Countess of Chester Health Park, Dale Barracks and Chester Business Park. The chosen spatial strategy (see SS 5 ‘Spatial strategy options’) will determine whether Green Belt boundaries will be amended, and the relevant existing policies may need to be amended to reflect this and/or national changes to Green Belt policy (including grey belt policy and guidance).  It is proposed to retain the content of Local Plan (Part Two) policies GBC 1.A-D to provide a framework and guidance for future development of these areas subject to comments received including from site owners/operators.  Dale Barracks will be put forward as a potential allocation due to the Ministry of Defence wishing to cease military use of the site.  Local Plan (Part Two) policies GBC 1.A-D will be amended to reflect the changes since the last plan and streamlined where necessary to avoid the repetition of policies and/or reflect changes to national policy. 

6.9 Current Local Plan (Part One) policy STRAT 10 Transport and Accessibility, and Local Plan (Part Two) policies T1 Local road network improvement schemes, T2 A56 Hoole Road corridor and T3 Railway Stations have criteria and proposals that impact Chester. Future policies in the Chester section or transport section will need to reflect updated proposals for transport in the city.  

6.10 Parking standards for residential development are the same across the borough although a more flexible approach can be taken for the re-use of buildings in high density areas that traditionally have no dedicated parking provision, such as The Rows in Chester. The supplementary planning document states this should only be for schemes that achieve other key aims such as preserving or enhancing heritage significance and the vitality and viability of town centres. For other users e.g. offices, hotels the number of spaces required are reduced within the Chester City inner zone and intermediate zone.  Local Plan (Part Two) policy T5 also prevents the redevelopment of existing public car parks unless adequate replacement is provided.  

6.11 To promote residential development within the city centre and surrounding area in line with the One City Plan and Chester Gateway study it is proposed that a revised approach is taken to parking. This could mean zero or limited parking would be required for new residential, office, hotel or other developments within existing or amended inner and intermediate zones. Further that car parks in The Gateway area can be redeveloped without alternative provision being made although the aim to improve parking facilities at the rail station would remain unchanged.   

6.12 Chester Business Park continues to be an important office location although there may be a need to take a more flexible approach to employment uses on the site. The Economic Needs Assessment (2025) identifies the city as being attractive to businesses but there needs to be the right type of office provision.

CH 1

Chester

The suggested approach will reflect the One City Plan to recognise the uniqueness of the city and the opportunity to build on the city’s cultural and heritage offer and Chester’s strength as a compact, connected centre surrounded by accessible neighbourhoods including: 

  • promoting opportunities for sustainable travel.
  • increasing opportunities for people to live in the heart of the city through the right mix of housing and creating high quality places.
  • supporting a vibrant city centre and Chester’s role as a sub-regional centre. 
  • providing quality office space.

The new Local Plan will set out the level and location of new development with protection of the historic environment and special character of the city remaining the priority.

The overall content of Local Plan (Part One) policy STRAT 3 and Local Plan (Part Two) policy CH 1 will be retained, relating to development in Chester and protecting the historic and special character of the city including areas identified as strategic open space. 

The content of Local Plan (Part Two) policy CH4 for the University of Chester will be retained.

The approach will retain Local Plan (Part Two) policies CH 5 and CH 6 to protect the heritage of Chester with the addition of reference to Chester Rows Design Guide. For relevant development proposals within Chester, include the requirement to consult the Chester Archaeological Plan which defines Areas of Archaeological Significance and the Primary and Secondary Archaeological Character Zones (formerly part of Local Plan (Part Two) policy DM 50). 

Amend policies relating to parking to encourage new residential and other uses in the city centre and surrounding area.

Retain and update content of Local Plan (Part Two) policy GBC 1.A - Chester Zoo - for zoological purposes.

Retain and update content of Local Plan (Part Two) policy GBC 1.B - Countess of Chester Health Park - for medical and associated purposes.

Key Allocations / Policies

Policies will seek to support a vibrant city centre and seek to support and  retain uses, including cultural, that contribute to the attractiveness of the city as a place to live and visit.

Retain and update content of Local Plan (Part Two) policy CH 2.B Commonhall Street and policy CH 2.C Chester Castle and Riverside Area.

Update or replace Local Plan (Part Two) policy CH 3 regarding employment allocations:

  • Dale Barracks (mixed use) – set out level and type of development and identify areas to be protected and other requirements taking account of local community aspirations set out in the Upton Neighbourhood Plan. Update Local Plan.(Part Two) policy GBC 1.C.
  • Chester Gateway (mixed use) (part of Local Plan Part Two) policy CH 2.A) – allocate land for mixed uses including residential where compatible with protecting employment uses and incorporate other aims and try and link in development requirements for provision of infrastructure.
  • Chester Business Quarter – currently identified for some apartment accommodation but primarily for 44,000 sq. m of high-quality office space of which 7,800 sq. m has been developed for office. There has been a hotel development granted (3,700 sq. m permitted) with balance of 32,500 sq. m undeveloped. The consultation is seeking views on future allocation of the area for office uses.
  • Northgate Phase 2  – current Local Plan (Part
    Two) policy CH 2.A - anticipated policy approach will be for the next phase to be predominantly residential-led mixed-use development.
  • Chester Business Park – current Local Plan (Part One) policy ECON 1 and Local Plan (Part
    Two) policy GBC 1.D identifies Chester Business Park as a safeguarded strategic employment location for office uses located in the Green Belt. 
  • Chester West Employment Park and Sealand Industrial Estate – current Local Plan (Part One) policy ECON 1 existing employment land and premises are retained and protected for employment use. Qualitative improvements within these areas will be supported.
  • Other sites identified will depend on the chosen spatial strategy (see SS 5 ‘Spatial strategy options’).

Transport and infrastructure

Subject to TA 2 ‘Key local transport infrastructure priorities’ the suggested policy approach will identify the key transport priorities for Chester, which may include:

  • Improvements to the A56 Hoole Road Corridor
  • Allocating land for a 5th park and ride site
  • Supporting capacity improvements at Chester Station

Appropriate provision should be made for access and parking in line with a review of parking standards and parking zones as set out in TA 1 ‘Transport and accessibility’, where there is a concentration of services, increased sustainable transport options and lower levels of car ownership.

Approach to Chester Business Park 

Land to the east of Wrexham Road, Chester will continue to identified as an established business park within the Green Belt. Development proposals for office development, Use Class E(g)(i), within the area defined on the policies map will be supported where they are in line with the suggested policy approach set out in  EG 1 ‘Economic growth, employment and enterprise’ and providing:

  1. they provide for a high-quality development in a parkland setting; and
  2. the traffic/transport requirements generated by the development can be safely and satisfactorily accommodated on the highways network.

Proposals for the refurbishment of vacant office premises for continued economic use would be supported. 

Proposals for the change of use of vacant office floorspace to an alternative use, would be assessed against he suggested policy approach set out in  EG 1 ‘Economic growth, employment and enterprise’

The policy approach could consider if flexible employment uses that support jobs (such as research and development, educational or health related use), may be acceptable where there is evidence of long-term vacancy and where this would maintain the vibrancy of the business park. Additional safety/security measures should be provided where appropriate.

New residential development within Chester Business Park would not be permitted. 

Question CH 1

Do you agree with the suggested policy approach towards Chester, as set out in  CH 1 ‘Chester’ above? If not please suggest how it could be amended?

Question CH 2

Do you have any comments on the suggested allocations/sites, set out above?

Question CH 3

Do you have any views on how the aspirations of the One City Plan and Chester Gateway Regeneration Framework should be reflected through the new Local Plan?

Question CH 4

Are there any infrastructure requirements required to support the suggested policy approach, set out in  CH 1 ‘Chester’ above?

Question CH 5

Should the approach to public car parks and parking requirements in the city centre and surrounding area be amended to support new development?

Question CH 6

Should the new Local Plan continue to allocate Chester Business Quarter for high quality office uses? If not, how can new office development in Chester be provided?

Question CH 7

Do you agree with the suggested approach towards Chester Business Park?

Question CH 8

Should there be a more flexible approach to uses supported within Chester Business Park?

Question CH 9

Is the current policy approach to the University of Chester in current Local Plan (Part Two) policy CH 4 still appropriate?

Question CH 10

Should the policy approach in relation to protecting the historic importance of Chester, including the setting of the city and strategic open space; archaeology, Chester conservation area; key views, landmarks and gateways and historic skyline remain unchanged?